The high and new Xuguan Industrial
Park in Su establishes for three months, with good
mental state with creative the mechanism of development,
around quickly steel, energy, deckle, chemical engineering,
medicine, precise machine, electronics electric appliances
and logistics etc. eight greatest industrieses base
developments, meticulous and stubborn and struggling,
overcame to move to move to have great capacity, the
engineering has great capacity and canvass business
to compete the pressure the big ising many with the
tight etc. in time heavy difficulty, rob time, strive
speed, industry park various developments developments
work makes the new progress.
For guaranteeing the Xuguan Industrial Park foundation
facilities with move to move to settle building developments,
Xuguan town 4 every kind of problem for moving moving
work set overcoming variously difficulty, abandonning
break having holiday, positively working well crowd
working, appropriately handling meetings, make move
to move the work can smoothly progress.Since 9 beginning
of the months start replying the evaluation work,
there has been more than 250 doors completes to reply
the evaluation and signed to move to move the setting
the agreement the book, still have at the same time
more than 20 doors have started the old building tores
down the work.
Main trunk highway in Xuguan Industrial Park ——XuTong
east road, XuYang road, lotus south road engineering,
have completed the pure table in ground now 3130 rice,
the soil pipe, rain water tube builds 2010 rice with
1780 rice, the roadbed dust starts construction 2050
rice.A trunk highway YongLian road, permanent stability
road, lotus road engineering, have completed the pure
table in ground 750 rices, soil pipes exhaust 775
rices, rain waters tubes exhaust 425 rice.The 浒 gold
road —— is all long 3610 rice roads survey and map,
the prospect for the work to have completed, road
and tube net designs have completed, the design of
the bridge is anticipated to be completed on September
25th, and carry out to recruit to bid at the end of
this month procedure.
A the period move to move the building to have started
work formally on August 28, current direct shipping
links a the even foundation facilities is all to arrive
a construction for, eight marks segment unit all enter
field, the temporary facilities round with the steel
plate of colour the fence to have completed, the landscape
is green to turn with refute shore design the project
is positive further thin turn, the soil set up the
engineering to have broken ground the construction.Two
periods move the construction diagram design that
move the building to complete already and all, now
prepare to carry out the ex- period invite bids the
procedure.
The whole control of the industry park the programming
has entrusted Suzhou City programming design the institute
for research programming designs, the Public set up
the kit facilities project with construct the single
result diagram to have entrusted two units proceeding
designs, combining proceeding the tentative program
evaluation reviews.Internal water supply in area in
industrial park, provide spirit, cabled T.V., communication,
street lamp...etc. to have entrusted each profession
kit unit proceed the whole programming design.The
industrial park area exterior kit foundation facilities
enters the park area take care of the line to have
proceeded with related section in commission the coordination,
the circuit of the running water, Gas windpipe way
the alignment have provided the tentative program
need New and Hi-Tech Industial Park programming bureau
examination and approval.The power supply project
hases been proceeded by power supply section to consult
the evaluation reviews, industry park inside the old
a circuit tores down already practical, a circuit
move the procedure to have carried out, now be placed
in the project study and discuss for stage.
Canvass business to publicizee for the enlargement
dint a total programming, foundation for, drawing
on more outside companies to Xuguan Industrial Park
investing, the Suzhou Xinxu Investment Development
Co of Suzhou at than in a short time printing system
Xuguan Industrial Park English , japanese, Korean
version canvassing business publicizeeing volume,
detailedly introducing industry park facilities, investment
policy and items establish with start work the developments
process.At the same time around eight greatest industry,
the company is positive to open the exhibition canvasses
business to lead the investment works, passing the
effort, having fallen a business enterprise for or
garrison to have with the item now:110,000 volt transformer
item, municipal work hurl company of" back two
enter three" new material in POE in item, PET
in item, appliance in medicine in item, living creature
system in accessories in item, car in a machine in
item, spaceflight Dept mechanism , Su in machine in
steel of item, treasure item etc..Close August 30,
the intention invests 2,290,000,000 dollars with the
in hand item gross;The foreign capital business enterprise
also have the carhub, Canada of the Singapore friend
hair group William the electric appliances company
etc. intention gross invests USD 30,000,000 foreign
capital item.The company returns the point the outstanding
having talked the on the trail of service of the item,
ising a related procedure in ex- period that item
start work to carry out primarily with the intention
item of on the trail of practical, plan at December
30 recently big area had 3-4 equal scales to start
work developments with the item of the file time;The
foreign capital ushers try for registered 1-2 items
the end of the months ago, registering the capital
in USDs 10,000,000.
Pass the effort, the Xu Shu Guan town industry advantage
presents gradually, will become to gather together
the modern industry key figure between steel, energy,
deckle, chemical engineering, medicine, precise machine,
electronics electric appliances and logistics etc.
industry necessarily near future.
The Suzhou Xinxu
Investment Development Co of Suzhou synthesizes the
management Dept.
September 20th 2003